| Whereas the number of agents required can (and should) be
dynamic, changing from hour to hour, the number of lines required to
connect a call center with a central office exchange is fixed (at
least in traditional circuit switched technology) and must cater for
the maximum anticipated traffic levels which will be encountered.
Engineering the number of lines required is known as dimensioning
a trunk group.
The Erlang B traffic model can be used to estimate the number of
lines required. This traffic model requires the following inputs:
- Busy Hour Traffic
- Blocking
Busy Hour Traffic This figure represents the
quantity of traffic expressed in a unit called Erlangs. For the
purposes of these calculations, 1 Erlang can be considered
equivalent to 1 hour of calls.
The busiest hour must always be used for busy hour traffic
calculations. But, wrap up time is not included. In working out the
number of lines required, the busy hour traffic must be based on the
duration of the calls and the queuing times as these account for
trunk occupancy; wrap up time does not occupy a trunk.
Assuming our earlier call centre
example represents the busiest hour, the busy hour traffic is
calculated as follows:
BHT = [ Average call duration (s) + Average delay (s) ]
* Calls per hour / 3600
The resulting figure shows the total trunk occupancy in hours,
including the average delay period during which calls are being
queued in an ACD and occupying trunks.
So, the busy hour traffic figure would be:
BHT = [ 160 + 25 ] * 350 / 3600 BHT = 17.986
Erlangs
It is important to note that the busy hour traffic figure should
represent the busiest traffic load a call centre will ever be
offered. The trunk group being designed must be large enough to
cater not just for today's peak, but for every peak. Therefore,
extreme caution should be exercised when calculating BHT.
Blocking The blocking figure describes the
calls which cannot be completed because insufficient lines have been
provided. A figure of 0.01 means that 1% of calls would be blocked;
this is a normal figure to use in traffic engineering. For some
applications, 0.03 (3%) blocking is used.
Having established these two parameters, an estimate of the
number of lines required can be made using the Erlang B Traffic
Model. You can use our online calculator to work through this example
now.
- BHT = 17.986 Erlangs
- Blocking = 0.01
Pressing the Calc button reveals that 28 lines will be
required during the hour in question. Performing this calculation
using our Windows
95, Westbay Traffic Calculators is similar, but please refer to